 |
Scope of work: Removal and disposal of an existing floating marina, installation of 228 new floating slips, dredging of 20,000 cubic yards of sediment from the marina basin, and installation of 2,700 tons of stone revetment.
Piles were installed in bedrock using a floating crane equipped with an hydraulic auger, then grouted into place.
|