Scope of work: Removal of over 600' of deteriorated floating docks and installation of over 1,300' of new, state-of-the-art floating docks.
The new docks are moored with 40' long by 12 3/4" diameter steel pipe piles. The piles were driven using a floating crane equipped with a diesel hammer.
|