NORTH EAST YACHT CLUB RENOVATION

North East River Yacht Club

Scope of work: Renovate a nearly 80-year-old marina which began as a wharf with piers and docks added in a piece-meal fashion. The new state-of-the-art marina includes 77 floating slips and moorings with better capability to handle longer boats in berths 50 to 60 feet long, a big increase over the 43 slips in the old facility.

The project included:

  • Demolition of several hundred feet of deteriorated fixed piers,
  • Dredging of 5,000 CY of material from the marina basin, taking it to a depth of -6 feet MLW,
  • 926 LF of floating concrete wave attenuator with 12 floating fingers,
  • 4,300 SF of floating docks,
  • 570 LF of timber boardwalk,
  • 165 LF of vinyl bulkhead,
  • Two 30' long gangways,
  • Tie piles, and
  • All new utilities: electric, water, and sewage pump out.
case study North East Yacht Club Renovation
Previous project

Previous project

Next project

Next project


Design-Build Services

Boating Facilities
Heavy Carpentry
Pile Driving
Dredging
Erosion Control
Pipe and Cable
Fish Ladders

Member
Associated Builders and Contractors

WHY CHOOSE D&J
BROCHURE
NEWSWORTHY
RECENT PROJECTS
CASE STUDIES
EMPLOYMENT
CONTACT US
HOME

Member
Marine Trades Association of Maryland

Copyright © 2008 Dissen & Juhn Corporation. All rights reserved.
Ripples-on-Water Websites
Site Map