 |
Scope of work: Design
and build a 124-slip stick-built marina for the U.S. Department
of the Army after demolition and disposal of the existing floating
docks.
The replacement docks included:
- 1800 LF of 8-foot wide timber
dock,
- 56 4-foot wide by 15-foot long finger piers,
- 118 tie
piles, and
- complete utilities (water, electric, fire suppression,
and communications).
|