Dissen & Juhn logo Dissen and Juhn Corporation dredging crane, barge, and tug
dredging

RECENT PROJECTS
BAR

It pays to deal with the best.

SOUTHWEST AREA PARK

PICTURES

Scope of work: Construction of a public boat ramp and timber pedestrian bridge on the Patapsco River. A channel leading to the boat ramp was also dredged.

The 30' wide by 55' long cast-in-place concrete ramp required the design and installation of a deep cofferdam and featured two timber courtesy piers.

An 8' wide timber pedestrian bridge with attached canoe pier was constructed to span a small tributary and provid access to other parts of the park. The structure is supported by 55' long timber piles.

 
Previous project

Previous project

Next project

Next project


Design-Build Services

Boating Facilities
Heavy Carpentry
Pile Driving
Dredging
Erosion Control
Pipe and Cable
Fish Ladders

Member
Associated Builders and Contractors

WHY CHOOSE D&J
BROCHURE
NEWSWORTHY
RECENT PROJECTS
CASE STUDIES
EMPLOYMENT
CONTACT US
HOME

Member
Marine Trades Association of Maryland

Copyright © 2008 Dissen & Juhn Corporation. All rights reserved.
Ripples-on-Water Websites
Site Map